Three core scenario solutions
1. High speed railway subgrade compaction (maximum efficiency)
Pain point:
Traditional equipment requires layered compaction (each layer ≤ 0.8 meters), resulting in significant delays in the construction schedule
XS263J scheme:
Single layer compaction of 1.8 meters (amplitude of 2.5mm+excitation force of 480kN)
CMV system generates real-time compaction degree report (acceptance without rework)
Actual measurement of Jingxiong high-speed railway:
saving construction time of 37 days/100 kilometers of roadbed
2. Port reclamation project (anti-corrosion+anti quicksand)Pain point:
Salt spray corrosion leads to high failure rate, and saturated sand liquefaction is difficult to compact
XS263J scheme:
Whole car galvanized pipeline+titanium alloy radiator (salt spray resistance grade ≥ C5-M)
Variable frequency anti sand technology (25-30Hz automatic switching)
Shenzhen Yantian Port case: Equipment attendance rate of 98%, permeability coefficient ↓ 80%
3. Mine tailings dam (heavy load protection)
Pain points:
Flying stones can damage equipment, and clay cannot be compacted tightly
XS263J scheme:
Mine protection package (8mm steel plate bottom protection+oil cylinder anti-collision cover)
25Hz low-frequency kneading and pressing (clay permeability coefficient<10-cm/s)
| Work quality: | 26000kg |
| Engine rated power: | 140KW2200r/min |
| Nominal amplitude: | 1.9/0.95mm |
| Excitation force: | 405/290KN |
| Vibration frequency: | 27/32Hz |
| Compacting width: | 2170mm |
| Dimensions: | 6430X2470X3260mm |